Wed. Jan 15th, 2025

Ludhiana’s Canal Bridge Repairs Prompt Traffic Diversion Until March 24

WhatsApp Image 2024 03 10 at 12.09.44 AM
Spread the love
12 / 100

Ludhiana
9 March
Sandeep Dhand Ludhiana

In a bid to enhance public safety, Ludhiana authorities have rerouted traffic effective March 3, as crucial repairs commence on the city’s canal bridge. The three-week-long maintenance project aims to bolster the structural integrity of the vital crossing. Commuters are urged to plan alternate routes and anticipate delays during peak hours. Local officials assure that the temporary inconvenience is necessary to ensure the longevity and safety of the bridge.

WhatsApp Image 2024 03 10 at 12.09.44 AM 1
WhatsApp Image 2024 03 10 at 12.09.44 AM

Detour signs and traffic personnel are deployed to facilitate smooth navigation. Ludhiana residents are encouraged to stay informed about updates and cooperate with the temporary alterations for a safer commuting experience.

Related Post